Replacement Instructions - Gree LSQWRF35VM/NaA-M Service Manual

A series modular air-cooled chiller (heat pump)
Hide thumbs Also See for LSQWRF35VM/NaA-M:
Table of Contents

Advertisement

4.4.2 Replacement instructions

(1) LSQWRF35VM/NaA-M and LSQWRF35VM/NhA-M
Note: be sure there is no refrigerant inside the system and power supply has been cut off before
replacement.
Steps
1. Remove the
front panels.
2. Remove power
lines and the
electric heater.
3. Disconnect
power lines to the
compressor.
Test Operation, Troubleshooting and Maintenance
Replacement of the compressor
Image
• Remove screws at the front
• Loosened screws should be
• Pull the front panel upwards
• Properly keep the removed
• Note: there are two clasps
• Remove the insulation of the
• Loosen screws of power lines
• Draw out power lines.
• Draw out the electric heater.
• Note: power lines and
• Desolder pipes quick to avoid
• Keep the replaced
78
Instructions
pane.
put together to avoid loss.
and then remove it.
front panel to avoid from
being damaged.
at each panel for connecting
with side panels.
compressor.
with a screwdriver.
their terminals should be
numbered to avoid incorrect
rewiring.
deformation.
compressor complete for
further analysis.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents