3 Unit installation

3.1 Installation flowchart

Installation of the
main unit
Unit Installation
Technical disclosure
Material purchase
Connection of the
water system
Anti-corrosion and
insulation of pipes
Check on the security of all equipment
Check on the
field conditions
Piping
Pressure test
Cleaning of pipes
Protection for
finished products
Commissioning
26
Electric wiring
condensate pipes
Installation of
Installation of
connection
components
Insulating
Fixing