Gree LSQWRF35VM/NaA-M Service Manual page 86

A series modular air-cooled chiller (heat pump)
Hide thumbs Also See for LSQWRF35VM/NaA-M:
Table of Contents

Advertisement

Note: check the whole system, pipelines and electric lines, cut off power supply and reclaim
refrigerant before replacement.
Steps
1. Reclaim
refrigerant and
remove the middle
panel.
2. Take out the
coils, pipe clamps
and rubber pads.
3. Desolder
connection pipes.
4. Take out the
main body.
Test Operation, Troubleshooting and Maintenance
Replacement of the electric expansion valve
Image
• Cut off power supply of the unit.
• Reclaim refrigerant.
• Remove the middle panel.
• Take out coils.
• Loosen screws and take out pipe
clamps and rubber pads.
• Wrap the valve with wet cloth to
prevent the sliding block from being
burn out. In this case, care must be
taken to not let water enter the pipe.
• Desolder connection pipes and then
disconnect them with the main body
of the valve.
• Do charge nitrogen during
desoldering.
• Protection measures should be
taken during soldering to prevent
surrounding objects from being burnt
out.
Take out the main body of the electric
expansion valve.
82
Instructions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents