Gree LSQWRF35VM/NaA-M Service Manual page 88

A series modular air-cooled chiller (heat pump)
Hide thumbs Also See for LSQWRF35VM/NaA-M:
Table of Contents

Advertisement

Note: properly reclaim refrigerant, prepare tools and keep good ventilation.
Steps
2. De-solder
connection pipes.
3. Take out the
vapor-liquid
separator.
4. Clean the
system by
charging nitrogen.
Test Operation, Troubleshooting and Maintenance
Replacement of the vapor-liquid separator
Image
De-solder connection pipes with a
soldering gun.
Loosen fixed screws and take out the
vapor-liquid separator.
• Connect a nitrogen line. When its
size is quite large, use adhesive tape
for help to keep nitrogen naturally go
into the vapor-liquid separator.
• Clean the system by charging
nitrogen.
84
Instructions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents