Gree LSQWRF35VM/NaA-M Service Manual page 87

A series modular air-cooled chiller (heat pump)
Hide thumbs Also See for LSQWRF35VM/NaA-M:
Table of Contents

Advertisement

Note: check the whole system, pipelines and electric lines, cut off power supply and reclaim
refrigerant before replacement.
Steps
5. Replace it with
a new one.
6. Tighten coils,
pipe clamps and
rubber pads;
vacuum the
system; recharge
refrigerant and
then put back the
panel.
Note: properly reclaim refrigerant, prepare tools and keep good ventilation.
Steps
1. Remove front
panels.
Test Operation, Troubleshooting and Maintenance
Replacement of the electric expansion valve
Image
Replacement of the vapor-liquid separator
Image
• Solder pipes.
• Do charge nitrogen during soldering;
• Protection measures should be
taken during soldering to prevent
surrounding objects from being burnt
out.
• The bulge of the coil should match
with the re cess of the main body of
the valve.
• Keep the vacuum degree to -1.0bar.
Vacuuming period would be longer
for the repaired unit.
• Charged refrigerant should be
the same as that stated at the
nameplate.
• Power off the unit and then power it
on again.
• Put back the panel.
• Remove screws at the front panel.
• Loosened screws should be put
together to avoid loss.
• Pull the front panel upwards and
then remove it.
• Properly keep the removed front
panel to avoid from being damaged.
• Note that there are two clasps at
each panel for connecting with side
panels.
83
Instructions
Instructions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents