Gree LSQWRF35VM/NaA-M Service Manual page 97

A series modular air-cooled chiller (heat pump)
Hide thumbs Also See for LSQWRF35VM/NaA-M:
Table of Contents

Advertisement

Note: be sure there is no refrigerant inside the system and power supply has been cut off before
replacement.
Steps
7. Put back the front
panels.
Note: there would be trapped oil inside the compressor during replacement, which would not affect its
reliability but increase resistance to the rotors and then consume more power. In order to expel it, it would
be better to install another valve at the lower point of the suction line. After that, run the compressor for
ten minutes and then open this valve until no oil comes out. Repeat this operation twice for normal oil
level.
Note: be sure power supply has been cut off and refrigerant has been reclaimed before replacement.
Steps
1. Remove the front
panel.
2. Record the
direction of 4-way
valves before
remove it. It is
prohibited to take
other units as
reference when
removing 4-way
valves of a multi-
system unit.
Test Operation, Troubleshooting and Maintenance
Replacement of the compressor
Image
Replacement of the 4–way valve
Image
Put back front panels and tighten
screws.
• Remove screws at the front panel.
• Loosened screws should be put
together to avoid loss.
• Pull the front panel upwards and
then remove it.
• Properly keep the removed front
panel to avoid from being damaged.
• Record the direction of a 4-way
valve.
• Remove its coils.
• To keep it complete, wrap the valve
with a wet cloth.
• Desolder the valve.
93
Instructions
Instructions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents