Note: be sure there is no refrigerant inside the system and power supply has been cut off before
replacement.
Steps
4. Loosen screws
at feet of the
compressor.
5. Replace the
compressor with
a new one.
6. Reconnect
the suction line,
the discharge
line, other pipes
and electric
lines. Then,
check for normal
operation of the
compressor.
Test Operation, Troubleshooting and Maintenance
Replacement of the compressor
Image
• Loosen screws at feet of the
• Loosened screws should be
• During replacement, care
• Seal the replaced compressor
• Place a new compressor
• Tighten the steel bushing with
• Reconnect and resolder the
• After soldering, charge high-
• Power on the unit and start it
• When the compressor runs
79
Instructions
compressor with a adjustable
or box spanner.
put together to avoid loss.
must be taken to not damage
rubber pads.
to prevent moisture entering;
at the rubber pads. Steel
bushing is required for rubber
pads.
screws.
suction and discharge lines.
Do charge nitrogen during
soldering.
pressure nitrogen for the leak
test.
through a AC contact for 2~3
seconds.
reversely, it would generate
harsh noise.