Installing The Load Chain - R&M LOADMATE LM Series Installation And Maintenance Manual

Table of Contents

Advertisement

LM01 I&M MANUAL/EN/11.30.2010

5.4.5 Installing the Load Chain

Figure 7.
Chain Installation
1-FALL CHAIN INSTALLATION
1. Attach last link of chain onto hook of CHAIN INSERTION TOOL (item 1, Figure 7).
2. If the insertion tool is not in the hoist (removal procedure), insert other end of CHAIN INSERTION TOOL
into chain opening closest to chain container side.
m
CAUTION: Make sure the chain weld on chain link faces inward toward chain wheel
pocket on hoist load sprocket. See Figure 7-A.
3. Run hoist "DOWN" in slow speed to feed chain through chain sprocket and out other side.
4. Attach fall stop at least 6.0 inches [150 mm] from end of chain (chain container side). Attach load block
assembly on other end of load chain. Refer to Figure 8 for details.
5. Make sure that load chain is not twisted or deformed.
6. Attach chain container.
This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise emplo yed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.
Figure 7-A. Chain Orientation
26/65

Advertisement

Table of Contents
loading

Table of Contents