A
200-240 V main inlet
B
100-240 V secondary or UPS inlet
C
UPS circuit breaker (10A)
D
MAIN input circuit breaker (15A)
1. Remove the four screws holding the AC receptacle knockout plate.
The AC supply is routed to the terminal block through an appropriate strain relief mounted on
this knockout plate.
2. To open the AC input area of the projector, remove the four screws holding the cover and
swing the cover downwards to open it.
CP2309-RGB Installation and Setup Guide
020-103078-01 Rev. 1 (06-2019)
Copyright
2019 Christie Digital Systems USA, Inc. All rights reserved.
©
Installing and setting up
17