Operation Of The Bucket; Unit Swing And Boom Swing Operation; Unit Swing Operation; Boom Swing Operation - Kubota KX080-4 Operator's Manual

Hide thumbs Also See for KX080-4:
Table of Contents

Advertisement

38
EXCAVATOR OPERATION

OPERATION OF THE BUCKET

To dig using the bucket, move the right attachment control
lever from the neutral position, left. Moving the control
lever right, moves the bucket outwards and empties its
contents.
UNIT SWING AND BOOM SWING
OPERATION
To avoid personal injury:
A When working in groups, always let the others
know what you are going to do before you do it.
A Keep others away from the machine working
area.
A Be sure to lock the boom swing pedal when the
boom swing function is not used.
BUnit Swing Operation
1. Move the control lever to the left and the upper
structure will turn to the left.
2. Move the control lever to the right and the upper
structure will turn to the right.
BBoom Swing Operation
1. Flip the pedal lock up to unlock the pedal.
2. Step on the left side of the pedal to swing the boom to
the left.
3. Step on the right side of the pedal to swing the boom
to the right.
(1) Boom swing pedal
(2) Pedal lock
A Do not operate the left attachment control lever
abruptly from right to left (or vice versa), because the
inertia may cause high impact loads on the swing gear
and the swing motor, shortening the life of the
excavator.

Advertisement

Table of Contents
loading

Table of Contents