Operation Of Bucket; Swivel(Unit Swing)Operation; Boom Swing Operation; Operation Of The Dozer - Kubota u25 Operator's Manual

Super series
Hide thumbs Also See for u25:
Table of Contents

Advertisement

24
EXCAVATOR OPERATION

OPERATION OF BUCKET

To dig using the bucket, move the right attachment control
lever from the neutral position, left. Moving the control
lever right, moves the bucket outwards and dumps its
contents.

SWIVEL(UNIT SWING)OPERATION

To avoid personal injury:
A When working in groups, always let the others
know what you are going to do before you do it.
A Keep away from the working area.
A Do not operate the left attachment control lever
abruptly from right to left (or vice versa). Because of
the low of inertia, this causes an impact load on the
swing gear and the swing motor. Additionally, the life
of the excavator will be shortened.
1. Move the control lever to the left and the upper
structure will turn to the left.
2. Move the control lever to the right and the upper
structure will turn to the right.

BOOM SWING OPERATION

1. Flip the pedal lock up to unlock the pedal.
2. Step on the left side of the pedal ( ) to swing the
boom to the left.
3. Step on the right side of the pedal ( ) to swing the
boom to the right.
(1) Boom swing pedal
(2) Pedal lock

OPERATION OF THE DOZER

1. To raise the dozer, pull back the control lever. Pushing
the control lever forwards lowers the dozer.
(1) Control lever
(2) Dozer
2. While undertaking earth moving work, control both
drive levers with left hand and the dozer control lever
with right hand.
(A) "Raise"
(B) "Lower"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents