Operation Of The Bucket; Unit Swing And Boom Swing Operation; Unit Swing Operation - Kubota KX057-4 Operator's Manual

Hide thumbs Also See for KX057-4:
Table of Contents

Advertisement

OPERATION OF THE BUCKET

To dig using the bucket, move the right attachment control
lever from the neutral position, left. Moving the control
lever right, moves the bucket outwards and empties its
contents.
EXCAVATOR OPERATION
UNIT SWING AND BOOM SWING
OPERATION
To avoid personal injury:
A When working in groups, always let the others
know what you are going to do before you do it.
A Keep others away from the machine working
area.
A Be sure to lock the boom swing pedal when the
boom swing function is not used.
BUnit Swing Operation
1. Move the control lever to the left and the upper
structure will turn to the left.
2. Move the control lever to the right and the upper
structure will turn to the right.
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

U55-4

Table of Contents