baltur TBML 80 PN Manual Instructions For Use page 46

Table of Contents

Advertisement

Available languages

Available languages

Rigid pipe fixing screw
Pressure intake in the
combustion chamber
Pressure transmission pipe in the combustion chamber
ASSEMBLING THE GAS TRAIN
There are different ways of assembling the valve train as shown
in drawing
0002936400.
Choose the most rational position for the
set-up of the boiler room and the position in which the gas pipeline
arrives.
!
In case of very large valves, e.g. DN65 or
DN80, make sure there is sufficient support
to prevent excessive stress on the gas train
connector.
Rigid pressure detection pipe in the combustion chamber
Cut flush with diffuser
ASSEMBLING VENTILATING UNIT
Position the half-hinges on the burner scroll in line with those
on the combustion head assembly.
Insert the hinge pin 10 in the position considered most suitable.
Connect the starter cables to the corresponding electrodes, close
the hinge, fasten the burner by means of the four screws 11. (No.4)
COMPLETING BURNER SETUP
Remove the protective yellow caps from the couplings beneath
the combustion head near the solenoid valves.
Connect the 12 diesel fuel pipes provided with the burner to their
corresponding connectors, making sure they are properly sealed.
8 / 36
0006081428_201406

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Tbml 160 pn

Table of Contents