INSTALLATION
GB
SYSTEM CHECK AND MECHANIC ADJUSTMENT
According to the most opportune techniques, realise a closing lid of the opening on the hull and fix it to the solid metal
plate to tunnel of the retractable unit.
Follow the sequence described below to verify the opening of the hatch:
The BTR propeller should be disconnected from power.
1)
Take the ring off and remove the pin (fig. 7 / part A), unhook the actuator from the lever (part. B), ensure that the
2)
pantograph system is free to open and close without any mechanical obstacle (manually moving the C lever).
FIG. 7
A
C
24
24
B
RETRACTABLE THRUSTER BTR185 - IT GB - REV004B