Setting Prog Chain - Chroma 62000D Series Operating And Programming Manual

Programmable bidirectiona dc power supply
Table of Contents

Advertisement

Programmable Bidirectional DC Power Supply 62000D Series
Operating and Programming Manual
Each program has a Run Count that sets the execution number.
Table 4-1 lists the Run Count range:
Ex. 1:
Set RUN COUNT for a program
Set Prog Chain =3, Run Count=2 for Prog No.1.
Set Prog Chain =No, Run Count=2 for Prog No.3.
The program execution flow of Run Count is listed in Figure 4-5.
A1: Execution steps:
(1) When all Prog No.1 sequences are done, return to Prog No.1.
(2) Repeat step (1) twice and skip Prog No.2 and jump to Prog No.3.
(3) When all Prog No.3 sequences are done, return to Prog No.3.
(4) Repeat step (3) twice.
(5) End
4.1.1.4
Setting Program Chain
Tap "Prog Chain" on the right and select "NO" or set the value from 1~10.
The Program Chain indicates the link among programs. To execute a different program,
select the next Prog No. to be executed. The setting range is 0 ~ 10.
When the value is set to 1~10, it means to chain the programs as the example shown below.
Ex. 2:
Chain among programs
Set Prog Chain =3, Run Count=1 for Prog No.1.
Set Prog Chain =6, Run Count=1 for Prog No.3.
Set Prog Chain =No, Run Count=1 for Prog No.6.
4-4
Table 4-1
RUN COUNT
TIMES
Figure 4-5
MIN
MAX
1
15000

Advertisement

Table of Contents
loading

Table of Contents