Chuttle Track Pre-Installation Requirements - Nuvo VISTOR Installation & Service Manual

Table of Contents

Advertisement

Chuttle Track Pre-Installation Requirements

Installation and repair of this equipment should be performed by qualified persons
only. Nuvo, Inc. does not warranty any damage or injuries occurring as a result of
improper installation.
Before installation, check to insure the following conditions are provided and in place.
• A structural ceiling mount meeting the specifications of the architectural plans, or suggested
structural mounting shown in figures 20 through 23. The installation must be capable of
supporting a weight of at least 200 pounds and an off center load of 500 ft-lbs.
• The track mount should not be mounted higher than 9 feet 6 inches (9 ½ feet) above the
floor. The track mount must be mounted at the finished ceiling level whether the ceiling
surface is solid or "dropped" type. Mounting the unit higher than 9 ½ feet may result in
instability of the light system and the arm assembly mounted too high to be accessable,
• Check the length of the ceiling rod supplied (located in the carton with the light head and
arm). The rod lengths available for the Chuttle Track are 16" long for a mounting height of 7
feet 6 inches to 8 feet 6 inches. A 25" long rod is available for a mounting height of 8 feet 7
inches to 9 feet 6 inches. If a problem occurs, contact our service department at (814) 899-
4220 then press 2.
• The mounting bolts used to fasten the track must be able to support a minimum of 200
3
pounds each (
/
8
5368 KUHL ROAD ● ERIE, PENNSYLVANIA 16510 ● PHONE 814-899-4220 ● FAX 814-899-1410
" diameter bolts required).
A member of the Medical Illumination International Group
Section 3
P
age 39 of 85

Advertisement

Table of Contents
loading

Related Products for Nuvo VISTOR

Table of Contents