Checks After Installation Of Pipes - Takara Belmont YUME ESPOIR Installation Instructions Manual

Table of Contents

Advertisement

Checks after installation of pipes

3
1 Test water flow
Precaution
Always test the water flow to prevent accidents during use.
* Test the water flow and inspect the following items. The hot water may be slightly tainted at the start of the water flow test,
however this does not indicate any problem.
(1) Is there no water leaking from the pipe joints
The pipe joints may come loose during transportation, so check the joints within the basin thoroughly.
(2) Are the hot water supply and water supply pressures at the same, stable pressure
(3) Can temperature be controlled properly
2 Clean
After the hot water becomes clear during the water flow test,
always clean the shower head.
Precaution
Failure to do so can result in insufficient flow rate and faulty
temperature regulation.
Take care not to damage or lose the O-rings and packing.
3 Attach the maintenance cover to the basin
Precaution
Take care not to hit or trap other parts when installing the cover.
Doing so may damage the parts and cause malfunctions.
(1) Insert the maintenance cover into the main body cover.
(2) Attach the cover with the screws.
(Urea screw M5 × 15, 1 pce)
* The Urea screws are held down the main body with the maintenance
cover. (see page 6 and 8)
* Attach the maintenance cover to the basin body in a position so that it
is in contact with the floor.
Precaution
Attach the Urea screw by hand without using any tools.
Using tools may cause damage to the plastic section.
Remove and clean any dirt trapped
Packing
Aerator core
Aerator holder
Maintenance cover
Urea screw
12
within the shower head
Shower head
Main body cover
Maintenance cover
Floor
Floor
* No gap

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the YUME ESPOIR and is the answer not in the manual?

Table of Contents