Sidewall Vent Termination - IBC Sl Series Installation & Operating Manual

Residential condensing boiler
Hide thumbs Also See for Sl Series:
Table of Contents

Advertisement

from any portion of the building and a minimum of 2 feet (61 cm) above the roof line
plus the anticipated snow line.

3.7.6 Sidewall vent termination

Caution
Vent termination clearances in this section are code minimum, or IBC-recommended
minimum requirements, and may be inadequate for your installation. Building envelope
details must be examined carefully. Take action to avoid moisture entering building
structures. Serious structural damage may occur if adequate precautions and
clearances are not considered. These precautions apply to neighboring structures as
well as to the structure the boiler(s) are installed in.
Vent terminal
Air supply inlet
Area where terminal is not permitted
Figure 19
Minimum clearances from vent/air inlet terminations (see legend on adjacent page)
3.7.6 Sidewall vent termination
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 10-85 g3Sl 14-115 g3Sl 20-160 g3Sl 30-199 g3

Table of Contents