Place the exhaust vent termination, so that it reaches 12" minimum above the down-
turned intake to avoid exhaust re-ingestion.
(Optionally) Raise the elevation of both terminations in "periscope style" after passing
through the wall, then to gain the required clearance configure as shown in
Figure 21
, and
Figure 22
Use a 45° elbow on the exhaust termination to launch the plume up and off the sidewall
(for protection of wall). A short piece of venting cut at 45° gives a horizontal termination
protected from wind loads (see
Recommend the use of a bird screen of ¼" stainless steel or plastic mesh (IPEX
System 636 drain grate) to guard against foreign objects.
Caution
Refer to local code requirements or restrictions when installing concentric side wall
termination kits. Ensure that the termination and venting slope back to the
appliance.
Figure 20
Vent termination clearance
.
Figure 20
,
Figure 21
Figure 21
32
Section: Installation
Figure 20
, and
Figure 22
).
Vent termination clearances
,

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl 10-85 g3Sl 14-115 g3Sl 20-160 g3Sl 30-199 g3

Table of Contents