Deleting A Project; Activating A Project - Viavi SmartClass OLP-87 Operating Manual

Smartclass fiber pon power meter
Hide thumbs Also See for SmartClass OLP-87:
Table of Contents

Advertisement

NOTE:
OLP-87/OLP-87P
The changes are immediately effective.
[F]
3.
Press the
button to close the edit menu.

Deleting a project

1.
Select the project you wish to delete.
[A]
2.
Press the
key and tap [Remove].
3.
Tap
[Yes]
to permanently delete the project.
The project is deleted and removed from the list.

Activating a project

To assign measurements to a project, the project must be
activated. There can always be only one active project.
1.
Select the project you wish to activate.
2.
Tap the
button.
– or –
[A]
Press the
key and tap [Set Active].
Allow a few seconds until the label ACTIVE is displayed at the
selected project.
Savings of measurement results are assigned to the selected
project.
5 M
ANAGING PROJECTS
D
ELETING A PROJECT
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents