Initial Commissioning
4.2

Unpacking and installation

21
Fig. 3
4.3

Preparing and adjusting the instrument

To commission the instrument, carry out the following tasks:
• Remove the transport anchors.
• Level the instrument.
• Insert the filter and attach the exhaust hose.
• Install the dispenser group.
• Align the nozzle relative to the specimen slide.
• Install the nozzle cleaner.
• Connect to the power supply.
28
14
• Grab hold of the bottom of the instrument on
• When doing so, ensure that the instrument is
• Pull the plastic protective hood off of the in-
• Remove the foam safeguard (21) for the lift.
• Open the loading door (65) and remove the
• Ensure that the provided accessories are
65
20
50
each side (have at least 2 persons do this)
and place it on a stable laboratory table.
standing on all four feet.
strument by pulling upwards and remove the
two adhesive strips (20).
foam cover for the loading bath.
complete in accordance with the order.
• Use the following accessories:
• Mountant bottle
• Cover slip catch tray
• Cover slip magazine
• Output magazines
• Loading bath
• Refill consumables.

4.3.1 Removing the transport anchors

• Open the service door (28) on the left of
the instrument and remove the foam
transport anchor (50) located behind the
drive for the loading bath.
Fig. 4