Unpacking And Installation - Leica RM 2235 User Manual

Rotary microtome
Hide thumbs Also See for RM 2235:
Table of Contents

Advertisement

4. Startup

4.3 Unpacking and installation

Fig. 6
16
When the instrument is delivered, check the tilt indicators on the
packaging.
If the arrowhead is blue, the shipment was transported laying flat,
was tilted at too great an angle or fell over during transport.
Note this on the shipping documents and check the shipment for
possible damage.
2 2 2 2 2
3 3 3 3 3
1 1 1 1 1
• Loosen and unscrew the six upper
screws (2).
• Remove the cover (1).
• Take the accessory carton (optional
accessories) (3) and the cartons (4)
from the standard scope of delivery.
The transport crate and includ-
ed retaining elements should
be kept in case a return ship-
ment is necessary later.
4 4 4 4 4
5 5 5 5 5
4 4 4 4 4
4 4 4 4 4
4 4 4 4 4
Instruction manual V 1.4 – 02/2010
Fig. 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents