Commissioning Protocol For The Installation Company - Kessel Aqualift F Compact Installation Manual

Wastewater lifting station for installation in a concrete slab/floor
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
11. Commissioning protocol for installation company
t
The initial operation and instruction was carried out in the presence of the person
authorised to perform the acceptance and the system operator.
t
The system operator/person authorised to perform the acceptance was informed
about the obligation to service the product according to the enclosed operating in-
structions.
t
Initial operation and instruction were not carried out.
The client/ person responsible for initial operation was handed the following components
and/or product components:
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
Initial operation and instruction is being carried out by (company, address, contact, phone):
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
The exact coordination of the dates for initial operation/instruction is being carried out by the
system operator and person responsible for initial operation.
Signature
Place, date
authorised to perform
acceptance
Signature of system
operator
47
Unterschrift
einbauendes Unternehmen

Advertisement

Table of Contents
loading

This manual is also suitable for:

2870128704

Table of Contents