Startup and Basic Operation
Power
The encoder can be powered in one of three ways:
•
•
•
When power is applied, the encoder runs a series of self-tests that blink the front panel
Power LED and all other indicators. The encoder then boots the NAV operating system. It
can take approximately 45 seconds for self-test and system startup to complete. When the
process is complete, the Power LED lights steadily.
NOTE: The encoder is NOT operational until the boot process is complete (the Power
Pairing Devices Manually
Manually pair devices as follows:
1.
2.
3.
4.
5.
Locally, from the included external power supply and via the power connector (see
on page 6).
Remotely, receiving PoE via the NAV 1G/PoE+ port (see
network switch or from an optional PI 140 Power Injector.
Locally (J) and remotely (G), with priority on the NAV 1G/PoE+ port. If PoE voltage
drops below a threshold, the encoder immediately transitions to the power connector
with no effect on system operation.
LED is lit steadily).
Use a Tweeker or other small screwdriver to press and hold the
encoder front panel ID button for approximately 3 seconds, until the
ID LED blinks. The encoder enters pairing mode.
One at a time, use a Tweeker or other small screwdriver to press and
hold the decoder front panel ID button for approximately 3 seconds,
until the ID LED blinks. Release the ID button. The decoder is now
paired to the encoder.
Repeat step 2 for each decoder.
Use a Tweeker or other small screwdriver to press and release the encoder front panel
ID button. The encoder exits pairing mode.
Repeat steps 1 through 4 to pair decoders to other encoders.