Breville Oracle Instruction Book page 39

Hide thumbs Also See for Oracle:
Table of Contents

Advertisement

Available languages

Available languages

PROBLEM
Water does not flow
from the group head
FILL TANK on LCD
but water tank is full
No hot water
No steam
The machine is 'On'
but ceases to operate
Steam pouring out
of group head
Espresso only drips
from the portafilter
spouts, restricted flow
Espresso flows out
too quickly
EASY SOLUTION WHAT TO DO
Machine has not
reached operating
temperature.
Water
tank is empty.
Water tank
not fully
inserted & locked.
Water tank
not fully
inserted & locked.
Water
tank is empty.
Steam
wand is blocked.
Coffee is ground
too finely.
The
coffee is ground
too coarsely.
Coffee
beans are stale.
Allow time for the machine to reach operating
temperature. The POWER button will stop
flashing when machine is ready.
Fill tank. Prime the system by:
1) Pressing 2 CUP button to run water through
the group head for
30 seconds.
2) Pressing HOT WATER button to run water
through the hot water outlet for 30 seconds.
Push water tank in fully and lock latch closed.
Push water tank in fully and lock latch closed.
Fill water tank.
Refer to 'Cleaning the Steam Wand', page 33.
Turn machine off. Wait for 60 minutes and turn
machine back on.
If problem persists, call Breville
Consumer Support.
Turn machine off. Wait for 60 minutes and turn
machine back on.
If problem persists, call Breville
Consumer Support.
Adjust the grind size to a higher number to make
the grind size slightly coarser.
Adjust the grind size
to a lower number to make the grind size
slightly finer.
Use freshly roasted coffee beans with a 'Roasted
On' date and consume between 5-20 days
after that date.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents