PPF system

In the standard setting the valves in the fall
sluices are positioned in such a way, that seed
is filled into the front and fertiliser into the rear
hopper.
The fertiliser distributor tower is in the rear
hopper.
Swapping the hopper ratio
The hoppers can be swapped if more seed than
fertiliser shall be placed.
Swap the cell wheels in the metering units.
¾
Fill fertiliser into the front and seed into the
¾
rear hopper.
Switch the valves in the fall sluices over to
¾
the respective opposite side and lock them.
Enter the correct placing quantity for the
¾
two metering units on the terminal of the
E-Manager and perform the calibration test
for each metering unit.
Follow the operating instructions for the
E-Manager.

Using both hoppers for seed

If no fertiliser is to be placed, both hoppers can
be used for seed.
To do so, access the Configuration menu in the
¾
E-Manager and select the option 2x seed in the
Metering unit item.
Enter the hopper ratio in the terminal of the
¾
E-Manager. The E-Manager controls the me-
tering units in such a way, that both hoppers
will be empty at the same time.
Adjust the air valves in the fall sluices so that
¾
the volume flow is directed to the distributor
tower for seed.
Close the distributor tower for fertiliser with a
¾
lid to prevent the inside hopper pressure from
escaping via the fertiliser system.
Set the valve in the seed hose to the middle
¾
position.
64
Fit both metering units with cell wheels for
¾
approx. half the desired seed quantity. If the
two cell wheels do not have the same size,
fit the larger wheel in the metering unit of the
rear hopper.
Perform the calibration test and enter the
¾
respective values in the terminal of the
E-Manager.
Follow the operating instructions for the
E-Manager.
G & F - System (Grain and
Fertilizer)
Machines with G & F system may be equipped
with one or two distributor towers.
Half-width shut-off - one distributor tower
On all machines with a distributor tower the
section can be manually switched with the dis-
tributor cover.
Manual half-width shut-off lid
Unscrew the distributor lid and reinsert it into
¾
the tower with the plates facing down.
Make sure that the desired side has been shut
down and check the air flow on the coulters of
the still open half with the fan running.