Checks - horsch Pronto 3 - 6 DC Operating Instructions Manual

Table of Contents

Advertisement

Checks

The quality of drilling work essentially depends
on settings and checks.
Before starting sowing you should therefore
¾
carry out all maintenance and service work.
Drilling must be checked when starting work
¾
and, in case of larger fields, also regularly in
between!
Machine
Has the machine been hitched up correctly
¾
and are the coupling devices locked?
Have the tractor link arms being locked
¾
against swinging sideways?
Have the hydraulic lines been correctly con-
¾
nected?
Has the machine been levelled in working
¾
position and the drilling depth correctly ad-
justed?
Cultivation tools
Are coulters, other cultivation tools and op-
¾
tional equipment still in a serviceable state?
Design with support wheels: Is the machine
¾
aligned horizontally via the upper link?
Do the coulters have sufficient pretension and
¾
do they all rotate freely?
Are the drill shoes still in good condition and
¾
correctly adjusted?
Is the working depth of the DiscSystem the
¾
same over the whole working width?
Is the consolidation of the packer uniform over
¾
the whole working width?
Pneumatic system
Fan
Is the hydraulic fan connected to a pressure-
¾
free return flow?
Are fan wheel and intake grille clean?
¾
Is the fan wheel tightly mounted on the shaft?
¾
Are fan speed and drive pressure not ex-
¾
ceeded?
Metering unit
Is the metering unit equipped with the correct
¾
cell wheel and is the sealing lip still in good
working order and adjusted correctly?
In case of small seed, has the cleaning brush
¾
been installed and is it in order?
Is the correct seed quantity being placed,
¾
especially in the case of small seed?
In the case of large seed, has the scraper
¾
been installed?
Are all connections, clearing valve and hopper
¾
tightly closed?
Is seed coming out of all coulters?
¾
Is seed bridging forming in the hopper (par-
¾
ticularly with husky seed)?
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents