Chapter 6: Assemble Door Frame (No Transom) - Nabco GT1175 Installation Manual

Standard and pocketed slide doors
Hide thumbs Also See for GT1175:
Table of Contents

Advertisement

www.NabcoEntrances.com
Rev.11-12-20
90.0°
R.O.
HEIGHT
1/4"
(6mm)
DN 1740
SECTION 5 .2: Remove the Header Cover
10-24 x .625"
Screw
DN 0393
1. Remove (2) 10-24 x 0.625 inch screws. Remove Header Cover by lifting it up and then pulling it out.
2. Unplug the Sensor (if equipped). Remove Parts boxes and/or Parts bags from inside Header.
CHAPTER 6: ASSEMBLE DOOR FRAME (NO TRANSOM)
DN 0768
1. Position Jamb Tubes on either side of Header according to the instruction sticker located on each Jamb Tube, showing
proper location and orientation. Ensure the removable cover side of Header is facing up.
NOTE: Header diagrams shown
with Access Cover removed.
FIXED SIDELITE UNITS:
ACCESS COVER TYPICALLY
FACES THE EXTERIOR
DN 2263
GT1175StandardandPocketedSlideDoorsInstallationManual;withOpusController
R.O. WIDTH
90.0°
FINISHED FLOOR
1/4"
(6mm)
Cover in
Closed Posi on
SINGLE
Door
Opening
1-3/4"
1/4"
(6mm)
FLOOR
Swing
UP
to Open
BI PART
Door
Opening
1 2
1 0
1 1
8
9
1 4
1 3
5
4
1
2
3
6
7
Figure 3 Orientate the Door Frame in relation to the Building
RECESS
4-1/2"
THRESHOLD
RECESS
THRESHOLD
1/2"
Figure 1 Masonry Opening
Li UP to
Pull out
Figure 2 Remove Header Cover
FULL OPEN UNITS:
ACCESS COVER TYPICALLY
FACES THE INTERIOR
P/NC-00370
7 of 62