Chapter 16: 110 Vac General Wiring - Nabco GT1175 Installation Manual

Standard and pocketed slide doors
Hide thumbs Also See for GT1175:
Table of Contents

Advertisement

www.NabcoEntrances.com
Rev.11-12-20
3. With a 1/4 inch masonry drill bit, drill through the Threshold and into the floor no less than 1-1/2 inch deep.
4. Secure the Threshold with Fasteners not provided by NABCO.
SECTION 15 .2: Threshold Maintenance
1. Check for wear of Bottom Guide Roller and Bumpers inserted within Threshold Channels.
2. Listen for squeaking/grinding noise.
3. Look for dirt/debris/excessive build-up. If dirt/debris/excessive build-up is found.
1. Vacuum to remove loose material.
2. Wipe off the Threshold.
3. Use (1) slotted Screw Driver to remove dirt/debris and/or excessive build–up located within Threshold Channels.
4. Inspect weekly and daily during winter as snow and ice can build up.
CHAPTER 16: 110 VAC GENERAL WIRING
Read and understand the "U30 Control Setup and Programming Manual" P/N 15-9000; and the
DANGER
"Electrical Installation Manual U30 Control" P/N 15-10596-30 before attempting to powerup the
GT1175 Slide Door . Failure to do so may result in damage to the Slide door and/or injury to the
installer and will nullify all warranties .
Disconnect power to the junction box prior to making any electrical connections . Failure to
DANGER
do so may result in serious personal or fatal injury . When uncertain whether power supply is
disconnected, always verify using a voltmeter .
Notice: Wiring must meet all local, state, federal or other governing agency codes .
Attention:  Electrical circuit to Nabco operator must not be not shared with other equipment such as lighting,
cash registers, or any device that might cause electrical interference on the circuit .
1. Ensure all power is disconnected at the Junction box and the 1175 Slide Door.
2. Determine correct supply voltage is 115 VAC ± 10%.
into an Electrical Conduit.
3. Insert all incoming 120VAC power wires into the access hole located on Jamb Tube. It is recommended to house all wires
Keep all incoming 120 VAC wiring separate from low voltage wiring within Header . Do not route
CAUTION
120 VAC wires near the U30 Microprocessor Control and Motor/Operator .
DN 2267
4. Go to the TB1 Port located on the Left side of the Opus Control.
5. Insert the Incoming 120 VAC Black (HOT) wire into the Circuit marked "L".
GT1175StandardandPocketedSlideDoorsInstallationManual;withOpusController
Fastener not provide by NABCO
DN 1048
OPUS Assembly, 1175
(except telescopic)
P/N A-01418
Metal Strip
Flat Surface
Figure 65 Secure Threshold to Flat Surface
Green (Ground)
White (Neutral)
Black (Hot)
P/NC-00370
Motor/Operator VS-150
P/N A-00914
27 of 62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents