AERMEC FCLI 32 Installation Manual page 28

Cassette-type fan coil with inverter
Hide thumbs Also See for FCLI 32:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
WATER CONNECTIONS
The water connections are made with
flat fittings complete with seal gaskets
(supplied).
In the 4-pipe version of the unit, it is
essential to install the valve accessory for
FCLI 600x600
inlet fitting main battery
air vent
main battery
inlet fitting
secondary battery
valve vent water
secondary battery
For the proper discharge of air and water through the special
valve is necessary to remove the condensate drain pan, as shown on
the previous page
For proper water drainage and must make sure that the hydraulic
connections main are closed.
Mod. FCLI
Attacks standard battery
Attacks additional battery
28
the hot water coil; use the supplied gaskets.
The accessory comes complete with gaskets
for connection to the system.
Information for the correct installation of
the valve is contained in the accessory
output connector
main battery
output connector
secondary battery
valve vent water
main battery
ø
ø
air vent
main battery
inlet fitting
main battery
inlet fitting
secondary battery
valve vent water
secondary battery
For proper drainage of water through the drain valve is neces-
sary to remove the condensate drain pan, as shown on the previous
page
For proper water drainage and must make sure that the hydraulic
connections main are closed.
32
34
42
3/4"F
3/4"F
3/4"F
3/4"F
3/4"F
1/2"F
3/4"F
1/2"F
instruction booklet.
The delivery and return pips must be equal,
suitably scaled and insulated to avoid
heat dispersion and dripping during cold
functioning.
FCLI 840x840
valve vent water
main battery
44
62
64
82
3/4"F
3/4"F
3/4"F
3/4"F
1/2"F
3/4"F
air vent
secondary battery
output connector
main battery
output connector
secondary battery
122
124
3/4"F
3/4"F
3/4"F
1/2"F

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents