Connector Panel Replacement - GE LOGIQ E10 Basic Service Manual

Hide thumbs Also See for LOGIQ E10:
Table of Contents

Advertisement

D
5750007-1EN, R
IRECTION
8-11-14

Connector Panel replacement

This procedure is essentially like replacing the Backplane, but the Backplane will not be removed.
Manpower /
Time
One person /
4 Hours
Table 8-333 Preparations and Preparation Links
DANGEROUS VOLTAGES, CAPABLE OF CAUSING DEATH, ARE PRESENT IN THIS
DANGER
EQUIPMENT. DO NOT REMOVE THE CAPACITOR PACK COVER.
WARNING Risk of electrical shock, system must be turned off. Avoid all contact with electrical contacts, conductors
WARNING
and components. Always use non-conductive handles designed for the removal and replacement of ESD
sensitive parts. All parts that have the potential for storing energy must be discharged or isolated before
making contact.
IF THE SHEAR WAVE OPTION IS PRESENT, MAKE SURE THE LEDS ON THE CAPACITOR PACK ARE
OFF BEFORE REMOVING THE CAPACITOR PACK.
Prior to removing the Card Rack Boards, the LEDs on the end of each board should be unlit, to indicate
boards are NOT powered.
DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO TAKING THE NECESSARY ESD
PRECAUTIONS:
1. ALWAYS CONNECT YOURSELF. THE ESD WRIST STRAP SHOULD BE CONNECTED TO ONE OF THE
TWO RECEPTICALS INTEGRATED ON THE FRAME, SPECIFICALLY FOR THAT PURPOSE.
2. FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC SENSITIVE EQUIPMENT.
Energy Control and Power Lockout for LOGIQ E10:
WARNING
WARNING
When servicing parts of the Ultrasound System where there is exposure to voltage greater than 30
Volts:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
TAG
&
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
LOCKOUT
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AND THE ON/OFF
Signed
Date
BUTTON (WHITE LIGHT ON THE OP PANEL) TO TURN OFF, AS THERE ARE NO TEST POINTS
TO VERIFY ISOLATION.
J10
5. REMOVE THE BATTERY COVER AND DISCONNECT THE POWER CABLES J10 and J11
TAG
&
J11
LOCKOUT
(black and red) FROM THE BACKPLANE. See:
Signed
Date
J10
replacement" on page
J11
Beware that the Main Power Supply, the Batteries, Power Module, ECB Shear Wave Capacitor Pack
may be energized, even if the power is turned OFF if the cord is still plugged into the AC Outlet.
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet, all Probes and External I/O Cabling.
3. Remove the Left Side Cover, the Battery Cover, Front Cover, Rear Cover, Front End Card Cage Cover, Front Plane
Boards and Main Power Supply.
4. Remove all Options within the Option Box, Printer or Printer Filler Storage and the Printer Tray.
8 - 314
Section 8-11 - Front End Acquisition / Card Cage parts replacement
. 1
EV
Table 8-332 Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E10" on page 8-6
8-2-6 "PPE Required During Service" on page
Preparations - you must perform the following steps
8-327.
Tools / PPE
8-6.
8-2-2 "Warnings" on page 8-3
Continued
LOGIQ E10 B
S
ASIC
ERVICE
/
and
8-11-15 "Rear I/O
M
ANUAL