GE LOGIQ E10 Basic Service Manual page 428

Hide thumbs Also See for LOGIQ E10:
Table of Contents

Advertisement

D
5750007-1EN, R
IRECTION
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) Connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
4.) Operate the XY and Z Controls to verify operation as intended.
5.) Select comments and type different A/N keys to confirm keyboard functionality.
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
See:
Section
4-2-3
4-2-7
4-2-7
4-2-7
4-2-7
4-2-4
4-2-6
8 - 182
. 1
EV
Table 8-216 XYZ Buttons replacement Functional Checks
Functional Check
Power ON/Boot Up
Probe/Connectors Checks
B-Mode Checks
System CFM and PWD Checks
Basic Measurements
Operator I/O Movement - XY and
Z-Mechanism
Power SHUT DOWN
Brakes and Direction Lock Functional
Checks
Section 8-7 - Replacing Top Console Parts
LOGIQ E10 B
Debrief Script
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Equipment passed all
required checks and is ready for use.
S
M
ASIC
ERVICE
ANUAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

5935000e10

Table of Contents