GE LOGIQ P6 Series Service Manual page 326

Table of Contents

Advertisement

GE H
EALTHCARE
5394152, Revision 5
D
IRECTION
8-2-46
Fuse Set
8-2-46-1
Tools
Common Phillips screwdrivers
Allen/Unbraco wrench
Stubby screwdriver (Flat tip and Cross tip)
8-2-46-2
Preparations
Shut down the system and switch off the main breaker.
8-2-46-3
Removal procedure
1.) Remove the AC Transbox assy. Refer to the
2.) Replace the 2 fuses located on the ACPC II assy in the transbox assy.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-47
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-9-15
Section 10-5-2-2
8-2-46-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Page 8-100
Figure 8-146 FUSE in Transbox(AP950) assy
Functional Tests
Section
Functional Test / Diagnostic Test
Fuse set Function Validation Procedure
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-42 "ARP II Assy 110V/220V" on page
Power On/Boot Up
Power Off / Shutdown
Peripheral/Option Checks
LOGIQ™ P6/P6 P
S
RO
ERVICE
Debrief Script
"Service Manual, Direction
5394152, Rev 1+, Section 8-2-46. Equipment
passed all required tests and is ready for use. "
M
ANUAL
8-91.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents