GE LOGIQ P6 Series Service Manual page 298

Table of Contents

Advertisement

GE H
EALTHCARE
5394152, Revision 5
D
IRECTION
8-2-29
CWD64 Assy
8-2-29-1
Tools
Common Phillips screwdrivers
8-2-29-2
Preparations
Shut down the system and switch off the main breaker.
8-2-29-3
Removal procedure
1.) Remove the Side Right Cover. Refer to the
2.) Remove the EMI Cover R. Refer to the
3.) Remove the RFC Assy. Refer to the
4.) Disconnects the CWD64 cable.
5.) Pull out the CWD64 Assy located in #3 from Nest box.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
Table 8-30
Service Manual
Section 4-3-1
Section 4-3-2
Section 4-9-4
Section 4-3-5
Section 10-5-2
Section 10-5-5
8-2-29-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Page 8-72
Figure 8-111 CWD64 Assy
Functional Tests
Section
Functional Test / Diagnostic Test
CWD64 Assy Function Validation Procedure
System CFM and PWD Checks
Functional Checks (See Also Chapter 4)
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-14 "Right or Left Side Cover" on page
8-2-24 "EMI Cover L and R" on page
8-2-32 "RFC Assy" on page
CWD64 cable
Power On/Boot Up
Power Off / Shutdown
Physical Inspection
LOGIQ™ P6/P6 P
S
RO
ERVICE
8-63.
8-78.
CWD64 Assy
Debrief Script
"Service Manual, Direction
5394152, Rev 1+, Section 8-2-29. Equipment
passed all required tests and is ready for use. "
M
ANUAL
8-48.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents