GE LOGIQ C9 Series Technical Publication page 220

Hide thumbs Also See for LOGIQ C9 Series:
Table of Contents

Advertisement

Care and Maintenance
Peripheral/option checks
Table 10-7:
Step
Item
1.
Media
2.
B/W Printer
3.
Color Printer
4.
DICOM
5.
ECG
6.
Footswitch
7.
DVD
Mains cable inspection
Table 10-8:
Step
Item
1.
Unplug Cord
2.
Inspect
3.
Verify
10-14
If any peripherals or options are not part of the system
configuration, the check can be omitted.
Refer to the User Manual for a list of approved peripherals/
options.
GE approved peripheral/hardware option functional checks
Verify media drive(s) read/write properlty. Clean if necessary.
Verify hardcopy output of the B/W video page printer. Clean heads and
covers if necessary.
Verify hardcopy output of the Color video page printer. Clean heads and
covers if necessary.
Verify that DICOM is functioning properly. Send an image to a DICOM
device.
Verify basic operation with customer
Verify that the footswitch is functioning as programed. Clean as necessary.
Verify that the DVD is functioning properly. Clean heads and covers if
necessary.
Mains Cable Inspection, As Appropriate
Disconnect the mains cable from the wall and Ultrasound system.
Inspect it and its connectors for damage of any kinds.
Verify that the LINE, NEUTRAL and GROUND wires are properly attached
to the terminals, and that no strands may cause a short circuit.
Description
Description
LOGIQ C9 Series – Basic Service Manual
5482298-100 English Rev. 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

5489329548933054893315489332

Table of Contents