Damage In Transportation; Certified Electrical Contractor Statement - For Usa Only - GE LOGIQ C9 Series Technical Publication

Hide thumbs Also See for LOGIQ C9 Series:
Table of Contents

Advertisement

Damage in transportation

Certified electrical contractor statement - For USA Only

i-12
All packages should be closely examined at time of delivery. If
damage is apparent, write "Damage In Shipment" on ALL copies
of the freight or express bill BEFORE delivery is accepted or
"signed for" by a GE representative or hospital receiving agent.
Whether noted or concealed, damage MUST be reported to the
carrier immediately upon discovery, or in any event, within 14
days after receipt, and the contents and containers held for
inspection by the carrier. A transportation company will not pay a
claim for damage if an inspection is not requested within this 14
day period.
All electrical Installations that are preliminary to positioning of
the equipment at the site prepared for the equipment shall be
performed by licensed electrical contractors. Other connections
between pieces of electrical equipment, calibrations and testing
shall be performed by qualified GE personnel. In performing all
electrical work on these products, GE will use its own specially
trained field engineers. All of GE's electrical work on these
products will comply with the requirements of the applicable
electrical codes.
The purchaser of GE equipment shall only utilize qualified
personnel (i.e., GE's field engineers, personnel of third-party
service companies with equivalent training, or licensed
electricians) to perform electrical servicing on the equipment.
LOGIQ C9 Series – Basic Service Manual
5482298-100 English Rev. 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

5489329548933054893315489332

Table of Contents