baltur GI MIST 1000 DSPGM Instruction Manual page 74

Progressive/modulating two-stage mixed gas/diesel burners
Table of Contents

Advertisement

Available languages

Available languages

Notes on the programmer
programmer sequence
Time key
time (50 Hz)
in seconds
31,5
t1
Pre-ventilation time with open air gate
3
t2
Safety time
-
t2'
Safety time or first safety time with burners using pilot
burners
6
t3
Short pre-ignition time (ignition transformer on terminal 16)
-
t3'
Long pre-ignition time (ignition transformer on terminal 15)
12
t4
Time between the t2' start and the consensus to the
valve on terminal 19 with t2
-
t4'
Time between the t2' start and the consensus to the
valve on terminal 19
12
t5
Time between t4 end and the consensus to the power
regulator or the valve on terminal 20
18
t6
Post-ventilation time (with M2)
3
t7
Time between consensus upon start-up and the voltage
to terminal 7 (start delay for fan motor M2)
72
t8
Start-up duration (without t11 and t12)
3
t9
Second safety time for burners using pilot burners
12
t10
Time from start-up to the beginning of the air pressure
control without air gate real travel time
t11
Damper opening travel time
t12
Damper travel time in low flame position (MIN)
18
t13
Allowed post-combustion time
6
t16
Starting delay of consensus to air gate OPENING
27
t20
Time up to automatic closure of the programmer
mechanism after burner start-up
NOTE: With voltage at 60 Hz the times are reduced by nearly 20%.
30 / 42
0006080764 _201312
Output signals on
terminal board

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Gi mist 1000 dspgm ce66875410

Table of Contents