Manual Release In The Event Of An Electrical Fault; Fig. 52: Manual Unlocking Step 1; Fig. 53: Manual Unlocking Step 2 - Paravan WHEELCHAIR Series Operating Instructions Manual

Table of Contents

Advertisement

14.8

Manual release in the event of an electrical fault

>
1. In the event of an electrical failure, a manual emergency release is
located at the front edge of the Docking Station. Move the wheelchair
forwards to release the pressure on the locking pin and slide the red
release arm to the side and hold it there while the wheelchair moves
backwards out of the Docking Station.
>
2. A wired hand control can also be fitted (accessory). The red release
arm must be pushed to the side and should be held there while the
wheelchair is moved away.
>
3. If the described manual release procedure fails, an emergency
release tool made of red plastic is included with each Docking
Station. Move the wheelchair forwards to release the pressure on the
locking pin and place the emergency release tool in the gap between
the locking plate and the Docking Station. Push the unlocking tool
forwards until the locking pin is pressed down - then the wheelchair
can be moved backwards out of the Docking Station.
)
See also the separate instructions for the Dahl docking system
regarding operation and emergency release procedures.
96

Fig. 52: Manual unlocking step 1

Fig. 53: Manual unlocking step 2

Loading and transporting the power wheelchair

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr 25

Table of Contents