Optional Equipment

Packing List

LP (Propane) Conversion Kit:
Rear Burner Orifice (#C55), Front Burner Orifice (#58), Pilot Orifice (0.14 LP), LP Regulator
Thimble (2-Piece
Assembly)
Pipe Shield
Header Shield
Lower Header Shield
The GSB2 and MV versions include a log set.
Wall Switch, Cover Plate, and Wire (GSB2 and MV only)
Remote (GSR2 only)

Additional Items Required

The GSR2 version of this fireplaces requires a log set (Oak = 94500771, Birch = 94500770)
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)

Recommended Installation Procedure

Frame the opening for the fireplace. Make sure to allow for vent installation.
Set the appliance in place.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 40).

Optional Equipment Installation

Before placing fireplace, install optional blower, remote, then Ember-Glo lights (leave ember glass out).
If using Propane, convert the appliance.
Install fireplace.
If using optional firebacks, install them.
Install ember glass (if used).
Install logs, ember chunks, and rockwool.
© Travis Industries