Packing List

Propane Conversion Kit (Front #58 Orifice, Rear #C55 Orifice, Pilot Orifice 0.14 LP).
2 Piece Firestop (sku# 250-05641)
Remote
Embers, Rockwool, Ember-Glass
Pipe shield (attached to the top of the fireplace)

Additional Items Required

Log Set
Vent Pipe (installation specific)
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)

Installation Overview

All requirements below must be met.
Top Vent
Configuration
See the section
"Mantel Requirements"
See "Optional Non-
Combustible Facing"

Recommended Installation Procedure

Frame the opening for the fireplace. Make sure to allow for vent installation.
This fireplace is designed to accommodate 1/2" (13mm) or 5/8" (16mm) drywall (see "Nailing
Brackets" on page 13 for details). Secure the fireplace to the framing.
Install the vent, gas line, and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Install the firebacks (optional)
Install the media
Finalize the installation (see page 36) and install the grill or face.
© Travis Industries
Drywall
Drywall
1" Min.
Side
25mm
Wall
See "Optional Non-
Combustible Hearth"
See the section
"Electrical Connection"
4/23/2021 - 1552
(for qualified installers only)
See the section
"Vent Requirements"
See the section
"Approved Vent
Configurations"
See the section
"Pipe Shield Installation"
Insulation must not fill
the 1/2" (13mm)
clearance around the
back and sides of the
fireplace.
Nailing Brackets
See the section "Minimum
Framing Dimensions"
See the section
"Gas Line Installation"