Download Print this page

3DAeroventures Super Chipmunk Build Manual page 13

3d printed r/c aircraft

Advertisement

Step-by-Step Build Guide (cont'd)
Step 2.2 Glue Motor Mount Locknuts in Place
Use the two-part epoxy resin to permanently glue the qty. 4, M4 x 0.7mm Thread
Lock Nuts in place in the hex-shaped recesses behind the firewall of Fuse 1.
Step 2.3 Heat Set Inserts for Cowling and Wing Mounts
2.3.1 Once the epoxy has dried, use a soldering iron to sink qty. 4, M3 x 0.5mm
Thread Heat-Set Inserts in place in the cowl mounting holes, which are
located on the sides of Fuse 1.
3D
Aeroventures
Place M3 Heat-Set
Inserts Here
www.3daeroventures.com
w�w�3�A�r�v�n�u�e�.�o�
N�v�r S�o� E�p�o�i�g� N�v�r S�o� Q�e�t�o�i�g� N�v�r S�o� P�a�i�g
Permanently Glue
M4 Locknuts Here
- 1� -

Advertisement

loading

Related Products for 3DAeroventures Super Chipmunk