Example Of Changing Parameters On 3-Tier System (When The First Half/Second Half Of Link Parameter Is Set) - Mitsubishi Electric MELSEC-A Series Manual

Network modules
Hide thumbs Also See for MELSEC-A Series:
Table of Contents

Advertisement

2
REPLACEMENT OF MELSECNET (II) AND /B (PLC TO PLC NETWORK)
2.5.4 Example of changing parameters on 3-tier system (When the first half/second
half of link parameter is set)
The following shows how to change network parameter on LB/LW, when replacing the MELSECNET II
3-tier system with MELSECNET/H. Network range assignment of the present MELSECNET II 3-tier
system is used as it is for replacement with MELSECNET/H.
MELSECNET II 2-tier is replaced with the network 1 of MELSECNET/H, and 3-tier is replaced with the
network 2. The MELSECNET II master station is replaced with the MELSECNET/H control station, and
MELSECNET II local stations are replaced with MELSECNET/H normal stations.
Optical loop
B/W 0
Link parameter of 2-tier
Link parameter of 3-tier
master station (L1/m)
2
- 43
MELSECNET II
A3UCPU
A2UCPU
M
L2
MELSECNET II
2-tier
A3UCPU
L1/m
MELSECNET II
3-tier
l1
l2
A2UCPU
A2UCPU
100
280 380 400
500
M
L1/m
L2
M
L1/m
m l1 l2
m l1 l2
100
180 200
280
500
580 600
Optical loop
Q06UDVCPU
Q02UCPU
680
780
FFF
L2
Empty
680
MELSECNET/H
Q02UCPU
1Mp3
1Ns2
MELSECNET/H
Network 1
Q06UDVCPU
Gateway
1Ns1/2Mp3
station
MELSECNET/H
Network 2
2Ns1
2Ns2
Q02UCPU

Advertisement

Table of Contents
loading

Table of Contents