First start - Start-up procedure
7.5.9

Mounting the coupling

1.
2.
3.
7.5.10

Checking the water circuits

Check that the cooling and cold water pumps are running and the shut-off fittings
in the circuit are in their operating positions.
If a cooling water or heat carrier controller is installed, this must be set under
project conditions so that the condensing and oil temperature lies within the
allowable range.
84
The electric switchgear is secured to prevent it from being switched on acci-
dentally.
Mount the coupling while observing the instructions of the separate documen-
tation.
The values for radial and angular deviations given in the coupling documenta-
tion must be observed in all cases. The axis distance between the compres-
sor drive motor and the compressor must be checked.
Danger
Start-up must not be carried out unless the coupling protection is fitted.
► Solid mounting of the coupling protection must be checked.