Verify that there is Cell Phone Texting service available at the generator site. (usually Verizon and
AT&T)
Do NOT throw out the Box or any packing materials at this time. (You will need some numbers from
the box when you activate the unit)
Open the generator, press the OFF button. Remove the 7.5A fuse, turn the main utility disconnect to
the transfer switch to OFF or Open position. Remove T1 fuse from the transfer switch.
Disconnect the Black (-) battery cable, then disconnect the Red (+) battery cable
Remove the controller cover
Attach the provided template to position the mounting hole location.
Hole location is critical for proper operation, the antenna must be 1" above the top of the generator
roof when completed.
Note: 2013 and newer models have a prepositioned dimple to mark the center of the hole.
Inspect the area behind the external breaker box to make sure all wires are moved out of the way
before drilling.
Using the template and/or the prepositioned dimple, drill a 1 1/8" hole just behind the breaker box.
Route the six pin connector through the plastic fitting and one green gasket.
Insert the fitting from the inside of the unit through the hole. Position the threaded end out.
Install the 2nd green gasket over the threads on the outside of the enclosure.
Thread the antenna onto the Mobile Link unit. Turn clockwise until secure, position up.
Insert the six pin plug into the Mobile Link unit (connector will only fit one way - Do Not force)
With the plug installed, from the inside of the generator thread the Mobile Link onto the plastic fitting
and tighten to draw the MobileLink to the Generators wall.
Do Not over tighten. The antenna should be facing upwards.
Route the harness along the shelf. Tie wrap as necessary.
6463 Mobile Link
90
Need help?
Do you have a question about the PowerPact 6561 and is the answer not in the manual?
Questions and answers