The genset must be installed on a level surface. The base frame must be level within 1/2 inch all
around (Nexus manual says 2").
The generator is typically placed on pea gravel or crushed stone.
Pea gravel - must be 4" (102mm) deep, compacted and level. You may build a frame around the area
that you want to install the generator. Also, use something to inhibit weed growth through the gravel.
Check local codes if a concrete slab is required. If a concrete base slab is required.
Concrete base slab which should exceed the length and width of the generator by a minimum of six
(6) inches (0.152 meters) on all sides.
There are four mounting holes in the base of the generator to secure it to the concrete.
3" GenPad - Level and compact the ground where the pad will be placed. Lay the GenPad on the
ground. Bolt the generator to the pad.