10 Post-Accomplishment Verification

Upon completion of the update, power off the AV-30-E and power it back
on, during power up verify the displayed firmware version is 1.1.0.

10.1 Hard Calibration

Hard Calibration must be completed after AV-30 is installed and before any
flight operations.
1. With the AV-30 in the AI mode enter the "SETUP" page by pressing
the left button 2 times. The aircraft must be on the ground with no
movement.
2. Rotate the center knob until "HARD CAL PRESS TO CAL" is
displayed.
3. Press the center knob
4. Ensure the aircraft is completely motionless and on the ground during
the next several steps. Do not leave the aircraft during the
countdown.
5. Press the right button below "CALIB"
AV-30-E Service Bulletin Software Upgrade 1.1.0
UAV-1005261-001 Rev A
21