Scope Of Delivery; Set-Up And Assembly; Installation Site Requirements; Assembly Of The Drilling Machine - Optimum OPTIdrill B 16H Operating Manual

Bench drill
Hide thumbs Also See for OPTIdrill B 16H:
Table of Contents

Advertisement

3.2

Scope of delivery

When the machine is delivered, please check immediately that it has not been damaged during
transport. Compare the scope of delivery with the attached packing list.
3.3

Set-up and assembly

3.3.1

Installation site requirements

Organise the working area around the bench drill according to the local safety regulations.
INFORMATION
In order to attain good functionality and a high processing accuracy as well as a long service life
of the machine, the place of installation should fulfil certain criteria.
Please observe the following points:
The device must only be installed and operated in a dry and well-ventilated place.
Avoid places close to machines which cause chips or dust.
The installation site must be vibration-free, i.e. located away from presses, planing machi-
nes, etc.
The substructure must be suitable for the bench drill. Pay attention also to the load-bearing
capacity and evenness of the floor.
The substructure must be prepared in such a way as to ensure that, if any lubricant is used,
it cannot penetrate the floor.
Any parts sticking out such as stops, handles, etc. have to be secured by measures taken
by the customer if necessary in order to avoid endangering persons.
Provide sufficient space for the personnel preparing and operating the machine and trans-
porting the material.
Also make sure the machine is accessible for setting and maintenance works.
Provide for sufficient backlight (Minimum value: 500 Lux, measured at the tool tip). In the
event of a lower level of lighting, additional illumination must be provided, e.g. by means of
a separate workplace light.
INFORMATION
The power plug of the bench drill must be readily accessible.
3.3.2

Assembly of the drilling machine

WARNING!
Danger of crushing when assembling and installing the
machine components.
INFORMATION
The drilling machine is delivered premounted.
Only put up the drilling machine at the installation site and pin up the drill chuck on the seat
cone.
3.4

Installation

Check the horizontal orientation of the base of the bench drill with a spirit level.
Check that the foundation has sufficient load-bearing capacity and rigidity.
Place the bench drill on the provided foundation.
GB
B16H
20
Translation of the original instructions
Version 2.0.1 - 2020-7-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

3020217

Table of Contents