Controller Canister; Power System - Adaptec DuraStor 6200SR Installation And User Manual

Raid appliance, storage enclosure and storage subsystem
Hide thumbs Also See for DuraStor 6200SR:
Table of Contents

Advertisement

DuraStor 6220SS/6200SR/312R Installation and User's Guide

Controller Canister

The DuraStor 6200SR RAID appliance contains two controller
canisters (see
Figure
2-4), each capable of housing a RAID
controller. One controller canister has a DuraStor 6200S RAID
controller preinstalled; the second controller canister is empty. The
empty canister contains the hardware you need to install a second
controller.
RAID Controller Installed Inside
GRAPHIC NEEDED HERE
Ready LED
Latches
Figure 2-4. DuraStor 6200SR Controller Canister
The controller canister fits into the front of the chassis, behind the
bezel, and is easily removable for quick controller installation or
replacement. See
Replacing a RAID Controller on page 5-2
for more
details.

Power System

The DuraStor 6200SR power system consists of two hot-swappable,
power supply units (PSUs) and two AC power cord connectors.
This system provides the appliance with an N+1 redundant power
system. Each PSU has auto-switching circuitry for 110/220 VAC
systems.
2-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Durastor 6220ssDurastor 312r

Table of Contents