First Commissioning; Power Supply; Cleaning And Lubrication; Filling In Gear Oil - Optimum OPTimill MB 4 Operating Manual

Drilling- milling machine
Table of Contents

Advertisement

3.4

First commissioning

WARNING!
First commissioning may only take place after proper installation.
First commissioned of the milling machine by inexperienced personnel constitute a risk
to personnel and equipment.
We do not accept any liability for damages caused by incorrectly performed
commissioning.
ATTENTION!
Before commissioning the machine, all bolts, fastenings and protections must be
checked and retightened as necessary!
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Tool holders may only be modified in compliance with the recommendation of OPTIMUM
or the clamping device manufacturer.
3.4.1

Power supply

CAUTION!
Install the connection cable of the machine in such a way that people will not stumble
over it.
Connect the electrical supply cable.
Check the fusing (fuse) of your electrical supply according to the technical instructions
regarding the total connected power of the drilling- milling machine.
3.4.2

Cleaning and lubrication

Remove the anti-corrosive agents which has been applied to the drilling- milling machine for
transport and storage. We recommend you use paraffin for this purpose.
To clean the drilling- milling machine, do not use any solvents, nitro-cellulose thinner or
other cleaning agents that could damage the paintwork. Observe the cleaning agent manu-
facturer's information and notes.
Grease all exposed machine parts using an acid-free lubricating oil.
Lubricate the drilling- milling machine in accordance with the lubrication schedule.

Inspection and maintenance on page 35
Check that all spindles are running smoothly. All spindle nuts are re-adjustable.
Disassemble the V-ledges of the cross table and clean the ledges from the anti-corrosive

agent.
V-ledges on page 37
3.4.3

Filling in gear oil

The drilling- milling machine is delivered without gear oil. Fill in gear oil.

Oil change on page 36
EN
MB4
24

Personnel qualification on page 10
Translation of original instruction
Version 1.1.1 - 2021-1-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3338450333845001333845002333845003

Table of Contents