Nokia Mobile Phones NSE-5 Series Service Manual page 77

Cellular phones
Table of Contents

Advertisement

PAMS
Technical Documentation
Interfacing
The interfacing between RF and BB is comprised of the signals stated
below.
SCLK
Clock for the PLL Serial Programming (3.25 MHz)
SDATA
Data for the PLL Serial Programming
SENA1
Latch Enable for the PLL Serial Programming
FRACTRL
Front–end Amplifier Control - Turns the gain in the LNA on and
off
BAND_SEL
Band Selection - Selects between GSM 900 and GSM 1800, i.e. it
turns on the respective mixers and LNAs in the CRFU3.
RXC
Receiver Gain Control - The control voltage for the AGC amplifi-
er.
AFC
Automatic Frequency Control Signal for the VCTCXO
RFC
A high stability clock signal for the logic circuits (13 MHz)
RXINN, RXINP
The differential RX signals to baseband
TXC
Transmitter power Control signal, that controls the shape of the
burst.
TXP
Transmitter Power enable ??
TXIN, TXIP
Differential In–phase TX baseband signals for the RF modulator
TXQN, TXQP
Differential Quadrature–phase TX baseband signals for the RF
modulator
VTX
Supply voltage for the TX chain, which is also used for control of
the GSM 1800 TX/RX switch together with BAND_SEL and
VRX_1
VRX_1
Supply voltage for a part of the RX chain, which is also used for
control of the GSM 1800 TX/RX switch
Issue 1 07/99
NSE–5
System Module
Page 2 – 63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents